Client: WSP
I-285/I-20 West Interchange Overview:
- Additional lane eastbound along I-20 from Factory Shoals Rd to I-285/I -20 West Interchange.
- New I-20 westbound CD system from I-285/I -20 through Fulton Industrial Blvd.
- New lane along I-285 southbound from DL Hollowell Pkwy to I-285/I -20 West Interchange.
- Reconstruction of ramps at the I-285/I-20 West Interchange to remove the left exits and improve the spped design.
Services Provided: Lead Geotechnical Engineer, Lead Hazardous Waste/UST Environmental Engineer, Lead Materials Engineer