What a Florida Milestone Inspection Checks and When It's Due

A Florida milestone inspection is a structural inspection that the state requires for residential condominium and cooperative buildings three habitable stories or more, first due by December 31 of the year the building reaches 30 years of age.

The definition in section 553.899 of the Florida Statutes treats that inspection as a look at load-bearing elements and the primary structural members and systems, done to attest to the life safety and adequacy of those components.

The Florida Building Commission fact sheet traces the statewide requirement to the Florida Condo Safety Act, enacted in May 2022 after the 2021 Champlain Towers South collapse in Surfside.

Florida Milestone Inspection Requirements

Florida's Division of Condominiums states that the requirement covers residential condominium and cooperative buildings, including mixed-ownership buildings, that are three habitable stories or more. The statute ties that coverage to residential condominiums under chapter 718 and cooperatives under chapter 719.

The statute also exempts single-family, two-family, three-family, or four-family dwellings with three or fewer habitable stories above ground.

  • Age is measured from the certificate of occupancy date, or from a local building official's occupancy record if that date is not available.
  • The first inspection is due by December 31 of the year the building reaches 30 years of age, and every 10 years after that.
  • A local enforcement agency may require the first inspection by December 31 of the year the building reaches 25 years of age, for local circumstances such as proximity to salt water, and every 10 years after that.
  • The local enforcement agency may extend the initial deadline for good cause, including when the owner has already contracted with an architect or engineer and the inspection cannot reasonably be finished in time.

Buildings that reached 30 years of age before July 1, 2022, were due for an initial inspection before December 31, 2024. Those that reached 30 between July 1, 2022, and December 31, 2024, were due before December 31, 2025.

How an Association Learns an Inspection Is Due

The association, together with any owner of a portion of the building that is not under the condominium or cooperative form of ownership, arranges the inspection.

The local enforcement agency must send written notice of a required milestone inspection by certified mail, return receipt requested. The notice goes to the association and to any owner of a portion of the building that is not under the condominium or cooperative form of ownership.

The association must notify unit owners of the required inspection within 14 days after it receives that notice, and must give the date by which the inspection has to be completed.

Phase one must be completed within 180 days after the owner or owners receive the written notice. Under the statute, completion means the licensed architect or engineer who performed phase one has submitted the inspection report to the local enforcement agency.

What Phase One Checks

Phase one is a visual examination of habitable and nonhabitable areas of the building, including the major structural components, with a qualitative assessment of structural condition.

The statute requires that this work be performed by "a licensed architect or engineer authorized to practice in this state." That is a requirement of the law for whoever performs the inspection, not a description of NOVA's staff.

If the phase one inspection finds no substantial structural deterioration, phase two is not required.

A phase one report is still prepared and submitted even when phase two is not required. The statute also states that the purpose of a milestone inspection is not to determine whether an existing building complies with the Florida Building Code or the firesafety code.

When Phase Two Is Required

Phase two is required if phase one identifies substantial structural deterioration. It may involve destructive or nondestructive testing at the inspector's direction. It may be as extensive or as limited as needed to assess areas of structural distress.

The statute defines substantial structural deterioration as substantial structural distress or weakness that negatively affects the building's general structural condition and integrity.

Surface imperfections such as cracks, distortion, sagging, deflections, misalignment, signs of leakage, or peeling of finishes do not count on their own. They count only if the licensed engineer or architect determines that those imperfections are a sign of substantial structural deterioration.

Nondestructive testing can include methods such as concrete scanning. Visible distress in the structure, including concrete spalling, may also be part of what a later look examines, depending on what phase one found.

If phase two is required, the statute also requires a phase two progress report, with a timeline for completion, to be submitted to the local enforcement agency within 180 days after the phase one report.

What the Milestone Report Must Include

The statute requires that a phase one or phase two report, at a minimum:

  • Bear the seal and signature, or the electronic signature, of the licensed engineer or architect who performed the inspection.
  • Indicate the manner and type of inspection.
  • Identify any substantial structural deterioration, describe its extent, and identify recommended repairs.
  • State whether any unsafe or dangerous conditions were found.
  • Recommend remedial or preventive repairs for other damaged items that are not substantial structural deterioration.
  • Identify items that need further inspection.

A sealed copy of the report, plus a separate summary of material findings and recommendations, goes to the association, to any other owner of a portion of the building, and to the building official.

The association must distribute the inspector-prepared summary to unit owners within 45 days after receiving the report. It must also post that summary on the property, and publish the full report and summary on the association website when the law requires one.

Local ordinances must require that repairs for substantial structural deterioration begin within 365 days after a phase two report is received.

How Milestone Inspections Relate to County Recertification

Miami-Dade County and Broward County have long-standing 40-year recertification programs. The statewide milestone inspection in Florida is a separate requirement, and it applies to residential condominium and cooperative buildings across the state, including a condominium in Miami-Dade and buildings in Central Florida.

A milestone inspection is also distinct from a structural integrity reserve study. Florida's Division of Condominiums describes a SIRS as a type of reserve study for future structural repairs, not as a structural inspection of the building itself.

Where Engineering Support Fits

NOVA's forensic engineering teams support Florida recertification and milestone requirements with structural assessments that identify deterioration and recommend repairs.

That forensic engineering work is available for structural assessments in Miami-Dade, for Broward County recertification, and for Central Florida buildings.