Project Description

The New Paulding County Courthouse and Administrative Building is a $64.7M Complex that includes 10 Courtrooms, Administrative and Programming Space and a 70-Person Holding Area.  The Courthouse Building is 3-Stories and Approximately 160,000 SF in Area.  The Administrative Building is 3-Stories and Approximately 100,000 SF in Area.

 

 

Owner Name and Address:

Paulding County
240 Constitution Boulevard
Dallas, Georgia 30132

Completion Date and/or Status of Project:

Completed March 2008

Services Provided:

Phase I Environmental Site Assessment, Geotechnical Evaluation, Soils Compaction Testing; Foundation and Subgrade Evaluation and Testing; Field and Laboratory Concrete Testing; Structural Steel Inspection and Testing; Asphalt Pavement Testing; Post-Tensioned Concrete Testing and Roofing Inspection And Testing

Project Size:

160,000 SF Courthouse and 100,000 SF Administrative Building

Client Reference:

Brian Albanese, Project Manager
The Facility Design Group
2233 Lake Park Drive
Smyrna, Georgia 30081
770.437.2700

Project Budget and Type of Contract:

$220,000 (Fees) / Time and Materials Contract

Architect/ Structural Engineer:

The Facility Design Group
Smyrna, Georgia
770.437.2700

 